All free tools

Bill of quantities · Homeowners, engineers & contractors

BOQ Rough Estimator & Generator Nepal

Generate a planning-level bill of quantities (BOQ) for an RCC house from built-up area—structure, masonry, plaster, finishes and services—with editable rates you can hand to a contractor for refinement.

Free foreverNo account requiredInstant results

Planning BOQ, not a tender document

A full BOQ is measured from drawings. This generator builds a rough bill of quantities from typical Nepal RCC house intensities so you can budget and brief a contractor. Replace every line with measured quantities before signing a contract.

Enter your project details

Your estimate

Rough BOQ total from typical Nepal house quantity intensities.

Total built-up area
3,000 sq. ft.

1,500 × 2 floors

BOQ subtotal (planning)
NPR 7,772,700
Contingency (8%)
NPR 621,816
Indicative project total
NPR 8,394,516

≈ NPR 2,798 per sq. ft.

Not a measured BOQ. Use drawings and a quantity surveyor for tendering. Rates are editable planning defaults only.

Generated BOQ lines

Copy these lines into your spreadsheet

ItemQtyUnitRate (NPR)Amount
Earthwork / excavation361,20043,200
RCC concrete (all)5418,000972,000
Reinforcement steel10,500kg1451,522,500
Formwork / shuttering240650156,000
Brick masonry6014,000840,000
Plaster (both faces)660450297,000
Flooring2401,800432,000
Painting750280210,000
Doors & windows (lump)3lot350,0001,050,000
Electrical package3lot280,000840,000
Plumbing & sanitary3lot320,000960,000
Misc / preliminaries3lot150,000450,000

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the BOQ Rough Estimator free?

Yes. The BOQ Rough Estimator works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.