Retaining Wall Cost Calculator Nepal

Estimate earth-retaining wall cost for sloping plots—stone masonry gravity, RCC cantilever or gabion—including excavation, backfill drainage, weep holes and editable rates.

Free foreverNo account requiredInstant results

Example rates only — replace with local quotes

Resists earth pressure by weight alone. Common and economical up to roughly 3 m of retained height. Rates assume reasonable site access for stone, sand and machinery. Steep hill plots, hand-carried material and monsoon working can add substantially. Contingency is set higher than other calculators here because retaining work meets more surprises below ground.

Enter your project details

Your estimate

A stone masonry gravity wall planning estimate from the length, retained height and rates you entered.

Base width (preliminary)
1.25 m

0.5 × retained height — a designed section may differ

Wall volume
42.5 m³

2.125 m³ per running metre × 20 m

Wall construction
NPR 276,250

42.5 m³ × NPR 6,500

Reinforcement steel
Not applicable

Gravity and gabion walls carry no reinforcement

Excavation
NPR 16,650

37 m³ × NPR 450

Granular backfill & drainage
NPR 21,000

15 m³ (300 mm drainage layer) × NPR 1,400

Weep holes
NPR 4,900

14 holes at 1.5 m spacing × NPR 350

Retaining wall subtotal
NPR 318,800
15% contingency
NPR 47,820
Planning budget
NPR 366,620
Cost per running metre
NPR 18,331

≈ NPR 7,332 per m² of exposed face

Planning estimate only—not a structural design. Retaining walls fail dangerously when earth pressure, surcharge from a building above, water pressure behind the wall, bearing capacity, sliding and overturning are not checked by a licensed structural or geotechnical engineer. Use this for budgeting, never for construction.

What this estimate assumes

Why drainage decides whether a retaining wall survives

  • Water trapped behind a wall can double the pressure it has to resist. The granular backfill layer and weep holes are not optional extras—they are the wall.
  • Volumes come from preliminary proportioning: gravity walls at half the retained height in base width, cantilever walls at 0.6×H with a 250 mm stem.
  • Foundation depth is measured below finished ground on the low side, and should sit on firm undisturbed soil or rock.
  • This is a boundary retaining structure, not a compound wall. For a brick compound wall around a flat plot, use the boundary wall calculator instead.

Formulas used

  • Gravity wall volume/m = ((0.45 + 0.5H) / 2) × H
  • Gabion volume/m = 0.6H × H
  • RCC volume/m = 0.25 × H + max(0.3, 0.08H) × 0.6H
  • Excavation = (base width + 0.6) × foundation depth × length
  • Total = (wall + steel + excavation + backfill + weep holes) × (1 + contingency%)

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Retaining Wall Cost free?

Yes. The Retaining Wall Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.