All free tools

Substructure budget · Homeowners, engineers & contractors

Foundation Cost Calculator Nepal

Estimate house foundation planning cost for isolated footings, strip or raft from built-up footprint, storeys, foundation type and editable excavation, concrete, steel and labor rates.

Free foreverNo account requiredInstant results

Enter your project details

Your estimate

A substructure planning budget from footprint, type and editable Nepal rates—not a structural design.

Footprint (metric)
111.48 m²
Foundation type
Isolated footings
Planning excavation
75.25 m³
Planning concrete
33.71 m³
Planning reinforcement
3,371 kg
Excavation cost
NPR 67,726
Concrete cost
NPR 606,828
Steel cost
NPR 353,983
Labor / formwork allowance
NPR 54,181
Planning total (with contingency)
NPR 1,190,990

Replace factors with your BOQ once drawings exist

Indicative planning factors only. Soil report, structural drawings, plinth beams, backfill, DPC, dewatering and access can change quantities and cost significantly. Confirm with a licensed engineer before excavating.

How this estimate works

Footprint × type factors × your rates

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Foundation Cost free?

Yes. The Foundation Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.