Column Footing Concrete Calculator

Estimate concrete volume, cement, sand, aggregate and rough steel weight for identical isolated footings from plan size, thickness, count, mix and rebar assumptions.

Free foreverNo account requiredInstant results

Enter your project details

Your estimate

Isolated footing pour quantities for identical pad sizes—edit plan dimensions from your structural drawings.

Concrete per footing
1.01 m³
Total wet volume
12.15 m³

12 identical footings

Order volume incl. wastage
12.76 m³
Cement
103 bags
Sand
5.36 m³
Aggregate
10.72 m³
Steel planning weight
1,148 kg
Material cost estimate
NPR 301,460

Not structural design. Footing size, depth, reinforcement and mix must come from the engineer. Pedestals, lean concrete, pile caps and stepped footings need separate quantities.

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Column Footing free?

Yes. The Column Footing works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.