All free tools

Renovation budget · Homeowners & NRN clients

House Renovation Cost Calculator Nepal

Estimate whole-house or partial renovation cost in Nepal from floor area and selected scope—structure repair, plaster, paint, flooring, kitchen, bathrooms, electrical and plumbing.

Free foreverNo account requiredInstant results

Renovation is not new-build math

Demolition, hidden damp, rewiring and access constraints often dominate. Toggle only the packages you need; open the bathroom and kitchen calculators for detailed rooms.

Enter your project details

Your estimate

Package-based house renovation budget for Nepal planning.

Structure / repair allowance
NPR 480,000
Plaster & paint
NPR 420,000
Flooring
NPR 540,000
Kitchen package
NPR 350,000
Bathrooms (2)
NPR 360,000
Electrical rewiring allowance
NPR 216,000
Plumbing allowance
NPR 192,000
Subtotal
NPR 2,558,000
Total with 12% contingency
NPR 2,864,960

≈ NPR 2,387 per sq. ft.

Planning allowances only. Obtain itemized contractor quotes after opening up finishes and confirming structural condition.

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Renovation Cost Calculator free?

Yes. The Renovation Cost Calculator works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.