Bathroom Renovation Cost Calculator Nepal

Estimate bathroom renovation cost from room dimensions, wall tile height, finish level, fixtures and optional demolition, waterproofing, plumbing and electrical scope—with editable Nepal planning rates.

Free foreverNo account requiredInstant results

Example rates only — replace with local quotes

Prefill values are planning defaults for Nepal bathroom renovations, not quotations or guaranteed market prices. Tile brand, waterproofing system, sanitaryware model, city labour and hidden pipe damage can move totals substantially. Edit every rate before relying on the estimate.

Enter your project details

Your estimate

A standard-finish bathroom renovation planning estimate from the dimensions and scope you selected.

Floor area (tiling basis)
35 sq. ft.

Length × width only

Wall tile area
150 sq. ft.

Perimeter 24 ft × 7 ft − 18 openings (not floor area)

Demolition / strip-out
NPR 3,325

35 sq. ft. floor × NPR 95

Waterproofing
NPR 25,900

185 sq. ft. (floor + net wet walls) × NPR 140

Floor tiles (supply + install)
NPR 13,300

35 sq. ft. × NPR 380

Wall tiles (supply + install)
NPR 48,000

150 sq. ft. × NPR 320

Sanitary fixtures
NPR 220,000

4 fixtures × 1 bath(s) × NPR 55,000

Plumbing rework package
NPR 55,000

1 bath(s) × NPR 55,000

Electrical / geyser points
NPR 28,000

1 bath(s) × NPR 28,000

Bathroom subtotal
NPR 393,525
12% contingency
NPR 47,223
Planning budget
NPR 440,748

≈ NPR 12,593 per sq. ft. of bathroom floor

Planning estimate only—not a quotation, BOQ or contract price. Defaults are not guaranteed market prices. Structural repairs, full wall rebuilds, imported sanitaryware beyond your fixture rate, false ceiling, vanity cabinetry, glass partitions, GST/VAT, design fees and mid-project upgrades are outside these lines unless you add them. Confirm rates with current local tile, waterproofing and plumbing contractors.

What this estimate assumes

Scope notes for a practical bathroom budget

  • No tile double counting. Floor tiles use length × width only. Wall tiles use perimeter × wall tile height − openings. Floor area is never added into wall area.
  • Waterproofing surface. When included, waterproofing = floor area + net wall tile surface (membrane under both), charged only on the waterproofing rate—not re-added as tile area.
  • Fixtures. Count WC, basin, shower set, mixer, mirror light, etc. as separate fixtures if you want item-level control; average rate × count is a planning shortcut.
  • Optional packages. Turn demolition, waterproofing, plumbing or electrical off when those scopes are already covered elsewhere or not required.

Formulas used

  • Floor area = L × W × bathrooms
  • Wall tile area = [2 × (L + W) × tile height − openings] × bathrooms
  • Waterproof area (if on) = floor area + wall tile area
  • Subtotal = demo + waterproof + floor tiles + wall tiles + fixtures + plumbing + electrical
  • Planning budget = subtotal × (1 + contingency%)

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Bathroom Renovation Cost free?

Yes. The Bathroom Renovation Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.