Estimate modular kitchen cost from base and wall unit running lengths, tall units, countertop area, finish level, sink package and contingency—planning defaults you can edit.
Free foreverNo account requiredInstant results
Example rates only — replace with fabricator quotes
Prefill values are planning defaults for Nepal modular kitchens, not guaranteed quotations. Carcass grade, shutter brand, granite vs quartz, city labour and custom profiles can move totals substantially. Edit every rate before relying on the estimate.
Enter your project details
Your estimate
A laminate modular kitchen planning estimate from the running lengths and scope you selected.
Base cabinets
NPR 16,800
12 RFT × NPR 1,400
Wall cabinets
NPR 8,800
8 RFT × NPR 1,100
Tall units
NPR 45,000
1 nos × NPR 45,000
Countertop
NPR 10,800
24 sq. ft. (base length × depth)
Sink package
NPR 25,000
Sink, basic faucet & install allowance
Hardware allowance
NPR 3,600
20 cabinet RFT × NPR 180
Kitchen subtotal
NPR 110,000
10% contingency
NPR 11,000
Planning budget
NPR 121,000
L-shape layout · Laminate
Planning estimate only—not a fabricator BOQ or fixed quote. Appliances, chimney, hob, plumbing rough-in beyond the sink package, tiling splashback, electrical points, GST/VAT and designer fees are outside these lines unless you add them. Measure net cabinet run lengths carefully so island or tall units are not double-counted in base RFT.
What this estimate assumes
Scope notes for a practical kitchen budget
Running feet. Enter net base and wall cabinet lengths (not full room walls). Island length should be added into base RFT only once.
Counter area. Countertop = base length × depth. Turn the line off if countertop is quoted separately.
Hardware. Allowance is cabinet RFT only. Disable it if unit rates already include soft-close hardware.
Excluded by default. Chimney, hob, fridge, dishwasher, loose furniture and civil kitchen platform if you already cast one outside modular scope.
Practical guide
Understand the numbers before you use them on site
Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.
Yes. The Modular Kitchen Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.
Can I use this result as a final quotation or professional approval?
No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.
How do I track the estimate during construction?
Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.