All free tools

Electrical services · Homeowners & contractors

House Electrical Wiring & Points Cost Calculator Nepal

Estimate house wiring cost from light, socket, fan and heavy-appliance point counts with editable per-point rates, distribution board, earthing and fittings allowance.

Free foreverNo account requiredInstant results

Example rates only — replace with local quotes

Per-point rates cover conduit, wire, box, switch plate and labour at typical Kathmandu valley levels. Copper brand, wire gauge, concealed versus surface conduit, and imported switch ranges (Schneider, Legrand, ABB) change the total substantially. Whole-house electrical commonly lands somewhere around NPR 150–500 per sq. ft. depending on fixture choice—check where your result sits in that band.

Enter your project details

Your estimate

A point-based house wiring estimate with a distribution board, earthing and a fittings allowance on top.

Total built-up area
2,000 sq. ft.

1,000 sq. ft. × 2 floor(s)

Total points
81 nos

4.1 points per 100 sq. ft.

Light points
NPR 79,200

44 × NPR 1,800 (suggested ≈ 44)

Socket / power points
NPR 52,800

22 × NPR 2,400 (suggested ≈ 22)

Fan points
NPR 22,000

11 × NPR 2,000 (suggested ≈ 11)

Heavy points (AC, geyser, pump)
NPR 18,000

4 × NPR 4,500 (suggested ≈ 4)

Distribution board & main panel
NPR 30,000
Earthing & protection
NPR 15,000
Fittings & fixtures allowance
NPR 103,200

60% of wiring — switches, sockets, lights, fans

Electrical subtotal
NPR 320,200
10% contingency
NPR 32,020
Planning budget
NPR 352,220

≈ NPR 176 per sq. ft. of built-up area

Planning estimate only—not a quotation and not an electrical design. Load calculation, cable sizing, protection coordination, inverter or solar tie-in, NEA connection charges, lightning protection and any statutory inspection must be done by a licensed electrical engineer or contractor.

What this estimate assumes

How house wiring is usually priced in Nepal

  • A "point" is one switch-controlled outlet: the conduit, wire, box, plate and labour from the distribution board to that outlet.
  • The suggested counts are a density starting point (roughly one light point per 45 sq. ft.). Walk your plan room by room and override them.
  • Heavy points carry a higher rate because they need larger cable, a dedicated MCB and often a separate run from the board.
  • The fittings allowance is where budgets swing most: local switches and lights sit near the low end, imported ranges near the high end.

Formulas used

  • Wiring = Σ (points of each type × rate for that type)
  • Fittings = wiring × allowance%
  • Subtotal = wiring + distribution board + earthing + fittings
  • Total = subtotal × (1 + contingency%)

Practical guide

Understand the numbers before you use them on site

Read the related guide for assumptions, ordering tips and ways to compare the estimate with actual site records.

Read guide

Same-category tools first so each intent stays clustered—then open the full hub if you need a different job.

Frequently asked questions

Use the estimate with confidence

Is the Electrical Wiring Cost free?

Yes. The Electrical Wiring Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.

Can I use this result as a final quotation or professional approval?

No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.

How do I track the estimate during construction?

Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.