Estimate terrace, bathroom, basement and water tank waterproofing cost by system—cementitious, liquid membrane, PU coating or APP membrane—with protective screed and contingency.
Free foreverNo account requiredInstant results
Example rates only — replace with local quotes
Common on flat RCC terraces; needs a protective screed above. Nepal market rates for waterproofing commonly run from about NPR 80 per sq. ft. for basic cementitious work to NPR 900 per sq. ft. for premium PU systems. Applicator skill and warranty terms matter more than the product price—ask for the system datasheet and a written warranty.
Enter your project details
Your estimate
A app / bitumen membrane waterproofing estimate across the wet areas you listed.
Planning estimate only—not a quotation and not a remedial diagnosis. An existing leak may need investigation, demolition of old finishes, structural crack repair or re-sloping before any system is applied; none of that is priced here. Always follow the manufacturer's specification and get the applicator's warranty in writing.
What this estimate assumes
Getting the treated area right
Terrace area is the flat plan area plus the upturn at parapets—add roughly the parapet perimeter × 1 ft of upturn if you want to be precise.
Bathroom area means floor plus the wet wall band, which is why it is usually larger than the floor plan alone.
Water tank area is the internal wetted surface: floor + four walls, not the external footprint.
Surface preparation is priced separately because it is the step most often skipped, and the most common reason a system fails early.
Formulas used
Total area = terrace + bathroom + basement + tank surface
Yes. The Waterproofing Cost works in your browser without an account. You can install GharNaksa when you want to track the real project costs, payments and progress.
Can I use this result as a final quotation or professional approval?
No. It is a planning estimate based on the information you enter. Verify rates, quantities, drawings, local requirements and contract terms with the appropriate qualified professional before making a commitment.
How do I track the estimate during construction?
Use GharNaksa to record actual material deliveries, labor, payments, bills and site photos. Comparing the estimate with a dated site record helps reveal cost differences early.